Cost tolerance and PIN approval
When goods arrive at a price different from the purchase order, for example a hardware supplier raised the price of a box of screws, the receipt cost is checked against a tolerance.
How the rule works
- Leaving the cost blank, or entering the order price, uses the purchase order price. Anyone who may receive can do this.
- Entering a different cost needs permission to set a receipt cost. A manager's approval does not replace it.
- Any difference is recorded. Within the allowed difference you can add an optional reason.
- Beyond it, a manager must approve, and a reason is required.
The allowed difference is a percentage plus an optional peso cap for the line. Whichever is exceeded first needs approval. With no setting the percentage is 5.
Set the tolerance
- Open Inventory Settings and the Receipt Tolerance tab.
- Enter Maximum variance percentage (%) and Maximum variance amount (₱).
- Click the save button. Only the owner or a procurement controller can change these.
Approve a cost on a receipt
When a line is beyond the tolerance, the receiving form shows "Beyond the allowed difference: a manager must approve it." and the This cost needs approval window opens.
- Enter Why is the cost different?
- If you may approve yourself, click Approve this cost. Your name and the reason are recorded.
- Otherwise choose the person under Who is approving?, have them enter their PIN on the number pad, and click Authorize.
- The line then shows "Approved by" the approver's name.
People with "no PIN set" cannot be chosen. If nobody has a PIN, an owner or admin sets one under Identity & Access, Account. Approved costs show Cost adjusted on the receipt list.
See Receive against a purchase order.